second floor framing
Rain shortened the day a bit yesterday, but nonetheless a good amount of progress. We were surprised to see a big trench for our water line running alongside the driveway. Not too much else looked different from the front, but the sheathing was in place on the roof of the garage. When we got inside, about half of the interior walls on the second floor were framed.
Hover your mouse over a pic to see the description.


















