drywall continues
The house is maybe 60% skinned with drywall now. We got the basement stairway skinned, which was kind of a bonus since builder Chad set us up not to expect that.
Anyway, there’s not a lot of exciting details to discuss, but there’s progress once again. All the flat ceilings in the second floor are skinned.








The pyramid vault celing in the master bath is really going to look cool. There’s going to be a lot of interesting lines in the master suite ceiling.
January 4th, 2004 at 2:59 pm