welcome to my home page
custom home archives
neighboring sites
googlers

Warning: include() [
function.include]: open_basedir restriction in effect. File(/home/custom-home/online.php) is not within the allowed path(s): (/home/custeus1/:/tmp:/var/tmp:/usr/local/lib/php/) in /home/custeus1/domains/custom-home.us/public_html/archives/00000078.php on line 44

Warning: include(/home/custom-home/online.php) [function.include]: failed to open stream: Operation not permitted in /home/custeus1/domains/custom-home.us/public_html/archives/00000078.php on line 44

Warning: include() [function.include]: Failed opening '/home/custom-home/online.php' for inclusion (include_path='.:/usr/local/lib/php') in /home/custeus1/domains/custom-home.us/public_html/archives/00000078.php on line 44

linear

custom home ++ drywall continues 09/17/2003

« Previous entry: drywall begins || Next entry: drywall continues some more »


The house is maybe 60% skinned with drywall now. We got the basement stairway skinned, which was kind of a bonus since builder Chad set us up not to expect that.

Anyway, there's not a lot of exciting details to discuss, but there's progress once again. All the flat ceilings in the second floor are skinned.


image
image
image
image
image
image
image
image
image

The pyramid vault celing in the master bath is really going to look cool. There's going to be a lot of interesting lines in the master suite ceiling.


« Previous entry: drywall begins || Next entry: drywall continues some more »

a single comment

jombang jombang jombang

posted by zero @ 1/4/2004 2:59 PM CST