It's really amazing how fast these guys work. Monday they finished installing the beam and supports, rim joists, floor joists, and subfloor for the first floor. They built a staircase to the basement, got the windows delivered, and even installed a couple in the garage wall that was framed. The garage wall with the windows also got the overhang installed and the paneling under the soffit is in place.