custom home ++ deliverance 06/07/2003
« Previous entry: signed, sealed, not delivered || Next entry: concrete poured »
This is starting to look like a construction site. The first thing I noticed driving up is the stacked lumber. Once I got to the end of the drive (which now had gravel all the way up to the garage door), the rebar ready for pouring the garage floor caught my attention and held it until I looked into the basement and saw the debris cleared and the gravel added, ready for pouring the concrete floors. Now that's a lot of progress in a day.












All in all, this is a lot of progress for a single day's work. We're pretty pleased with how it looks at this point. The site is nice and organized, with lumber stacked neatly except for the OSB which went astray. We police the area of drink bottles and cig packs when we visit every night too.