A lot of work was done when we came out to the site last night. There was sealer applied to our basement walls, parts of the foundation were backfilled, and the crushed stone base for the basement and garage floors was installed. Plus the plumbing for the basement is installed where the floor can be poured around it, and the inspection report was lying there that said it passed inspection. Plus excavator Mike started to build up the pad on the site where our barn will go, using clay from the excavation.
Lots of action, so lots of pics, let's dive right in:









Things are moving along surprisingly fast now. The utility markers are a sure sign we'll be trenching pretty soon I think.